FieldNews
Subscribe

Daily oil & gas and construction news for subcontractors

ComplianceGlossary Term

PAPR (Powered Air-purifying Respirator)

A battery-powered respirator that uses a blower to push contaminated air through filters before the worker breathes it. Subcontractors working in refineries, confined spaces, or around hazardous chemicals are often required to supply their own PAPR units. Fit-testing and training records must be maintained to meet occupational health regulations on site.

Related Terms

LFI (Learning From Incidents)

Compliance

A formal process where incident findings are shared across crews and job sites to prevent repeat occurrences. Subcontractors are often required by operators to distribute LFIs to their workforce and document acknowledgement. Failure to action LFIs can affect your standing on approved vendor lists.

Federal Lease

Compliance

A government-issued agreement granting a company the right to explore or extract resources on federally managed land. Subcontractors working on these sites must meet stricter regulatory and documentation requirements. Expect additional compliance checks, environmental controls, and reporting obligations on federally leased projects.

Caught-In Hazard

Compliance

A workplace danger where a worker's body or clothing becomes trapped, pinched, or pulled into moving machinery, equipment, or materials — common on oilfield and construction sites where subcontractor crews work near rotating equipment, conveyor systems, or heavy moving loads. Subcontractors are responsible for identifying and controlling these hazards through proper guarding, lockout/tagout procedures, and site-specific hazard assessments before work begins.

Metering Calibration

Compliance

The process of verifying and adjusting flow meters, pressure gauges, and other measurement instruments to ensure accurate readings that meet regulatory and client standards — subcontractors providing metering services must maintain current calibration records as proof of compliance and to avoid liability for measurement disputes or billing discrepancies.

FTA (Federal Transit Administration)

Compliance

A U.S. federal agency that funds and regulates public transit infrastructure projects. Subcontractors working on federally funded transit construction must meet strict FTA compliance requirements. These include labour standards, safety protocols, and Buy America provisions for materials.

Heat Illness

Compliance

A range of conditions caused by overexposure to heat, from heat cramps and exhaustion to life-threatening heat stroke. Subcontractors working outdoor or industrial sites must monitor crew members and follow site heat stress protocols. Failing to manage heat illness risks can trigger regulatory violations and project shutdowns.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project byAimsio