FieldNews
Subscribe
Compliance Glossary Term

Metering Calibration

The process of verifying and adjusting flow meters, pressure gauges, and other measurement instruments to ensure accurate readings that meet regulatory and client standards — subcontractors providing metering services must maintain current calibration records as proof of compliance and to avoid liability for measurement disputes or billing discrepancies.

Related Terms

PAPR (Powered Air-purifying Respirator)

Compliance

A battery-powered respirator that uses a blower to push contaminated air through filters before the worker breathes it. Subcontractors working in refineries, confined spaces, or around hazardous chemicals are often required to supply their own PAPR units. Fit-testing and training records must be maintained to meet occupational health regulations on site.

Confined Space Attendant

Compliance

A trained worker stationed outside a permit-required confined space to monitor entrants and conditions. They maintain communication with the entry team and initiate rescue procedures if hazards arise. Subcontractors must supply a qualified attendant or face work stoppages and liability on site.

Punitive Damages

Compliance

Court-ordered payments that go beyond compensating actual losses, intended to punish serious misconduct. Subcontractors can face these for gross negligence or wilful safety violations. Many prime contracts include clauses limiting or waiving punitive damage liability.

Third-Party Representative

Compliance

An independent inspector or agent hired by an operator or owner to verify that field work meets contract specifications. They are not your direct client but hold authority to approve, reject, or halt work on site. As a subcontractor, their sign-off is often required before progress billing is accepted.

MVR (Motor Vehicle Record)

Compliance

An official document showing a driver's licence history, violations, and suspensions. Clients and prime contractors often require MVRs before allowing subcontractor personnel to operate vehicles on site. A clean MVR is frequently a condition of insurance coverage and site access approval.

Asme Section Viii

Compliance

The ASME (American Society of Mechanical Engineers) code governing the design, fabrication, and inspection of pressure vessels. Subcontractors working on pressure vessels must ensure equipment bears the ASME stamp, confirming code compliance. Non-compliant vessels can trigger work stoppages and liability issues on site.

Stay sharp on field operations

Industry news and insights, delivered to your inbox.

Subscribe to FieldNews
A community project by Aimsio