A formal notice from an operator or prime contractor inviting subcontractors to express interest in an upcoming project or contract. It typically outlines scope, required certifications, and submission deadlines. Responding early can improve your chances of being shortlisted for the work.
Call for Participation
Related Terms
Midstream
IndustryThe segment of the oil and gas industry involved in processing, storing, and transporting oil, gas, and NGLs. Includes pipelines, gathering systems, and processing plants.
Prime Contractor
IndustryThe main company awarded a project contract who then hires subcontractors to perform portions of the work. As a sub, your agreement, invoicing, and compliance obligations flow through them—not the end client. They carry overall site liability and typically control scheduling and scope.
Limited Notice To Proceed
IndustryAn LNTP (Limited Notice to Proceed) authorises subcontractors to begin a defined scope of work before the full contract is executed. It typically covers early mobilisation, procurement, or site prep activities up to a specified dollar limit. Work performed beyond that limit is at the subcontractor's own risk until full NTP is issued.
Mid-Continent
IndustryA regional designation covering oil and gas producing areas across Oklahoma, Kansas, and parts of surrounding states. For subcontractors, it signals a distinct labour market, regulatory environment, and client base. Mobilisation costs and crew logistics differ significantly from other North American basins.
Gas-Directed Rig Count
IndustryThe number of drilling rigs actively targeting natural gas formations at a given time. A rising gas-directed rig count signals increased demand for field services and subcontractor crews. Tracking this metric helps you anticipate work volumes and mobilisation timelines in gas-heavy basins.
Spring Break-Up
IndustryThe seasonal period when melting snow and frost causes ground conditions to soften, restricting heavy equipment access to remote sites. Municipalities impose road bans limiting load weights, delaying material hauls and crew mobilisation. Subcontractors should plan for project slowdowns and reduced billable hours during this window.
Latest Industry News
DTE Seeks Bids for 150 MW of Michigan Solar, Due Jan. 19
DTE Energy is soliciting proposals for up to 150 MW of Michigan solar, with bids due Jan. 19, 2027 and operation required by mid-2030. The source names no sites or EPC, so subs should work the bidder side.
todayIndustrySite Subs Can Bill for Design-Assist: What to Put in Proposals
A site contractor writing in Construction Executive argues that deeper preconstruction work should be a paid service. Here is how site and hardscape subs can scope the fee, the conflict review and the terms.
todayIndustryAmtrak Opens 30th Street Station South Concourse in Philadelphia
Amtrak has opened the South Concourse at Philadelphia's 30th Street Station, part of a $550 million design-build update led by Gilbane. Lounge and retail upgrades are still to come.
yesterdayIndustryB.C.'s $286B Project Pipeline: Only $32.5B Is Under Construction
A Greater Vancouver Board of Trade review of 47 B.C. major projects finds just 11% of the roughly $286 billion in value is under construction. Labour availability between 2027 and 2030 is flagged as the key risk.
yesterdayRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews
