A secondary or auxiliary dock located away from a main terminal, used to load or offload vessels at remote points along a waterway. Subcontractors may be mobilised specifically to satellite jetties for marine construction, maintenance, or material handling work. Access and logistics can differ significantly from main terminals, affecting crew scheduling and equipment mobilisation.
Satellite Jetty
Related Terms
Well Intervention
IndustryAny post-completion operation performed on a producing well to restore or improve output. Subcontractors are often mobilised for wireline, coiled tubing, or pump work during these campaigns. Scope can change quickly, so confirm work orders before committing crew and equipment.
EPCM (Engineering, Procurement, Construction Management)
IndustryA project delivery model where one firm manages engineering, procurement, and construction on the owner's behalf. Subcontractors are hired directly by the owner, not the EPCM firm. Understanding this structure clarifies your contract chain, payment authority, and site reporting lines.
TVD (True Vertical Depth)
IndustryThe straight-line vertical distance from surface to a specific point in a wellbore, regardless of how the well is drilled — subcontractors working on directional or horizontal wells need to reference TVD (not measured depth) when scoping equipment reach, calculating hydrostatic pressures, or verifying work zone depths on service orders.
Brownfield
IndustryAn existing facility—such as a producing well, pipeline, or plant—being modified, upgraded, or maintained rather than built from scratch. For subcontractors, brownfield work often means tighter workspaces, live equipment hazards, and stricter site access requirements. Scopes can change quickly due to unforeseen conditions uncovered during work.
Appraisal Drilling
IndustryDrilling program that follows an initial discovery to confirm reservoir size and commercial viability. For subcontractors, it means short-term, high-intensity scopes between exploration and full development phases. Mobilisation windows can be tight and contract durations unpredictable.
Screening Circuit
IndustryA series of vibrating screens used on-site to separate solids by size from drilling fluids or aggregates. Subcontractors operating or maintaining this equipment must track run-hours carefully for service billing. Screen cloth replacement is a common scope item in solids-control contracts.
Latest Industry News
PCL Breaks Ground on $10B Airport Expansion Satellite Jetty at Montreal-Trudeau
PCL Construction and ADM Aéroports de Montréal have broken ground on a new satellite jetty at YUL Montréal-Trudeau International Airport, part of a $10 billion, 10-year capital improvement program.
6 months agoIndustryB.C.'s $286B Project Pipeline: Only $32.5B Is Under Construction
A Greater Vancouver Board of Trade review of 47 B.C. major projects finds just 11% of the roughly $286 billion in value is under construction. Labour availability between 2027 and 2030 is flagged as the key risk.
todayIndustryData Center Load Puts Long-Term Strain on Grid Spending
Global electricity demand is projected to rise by more than 10,000 TWh over ten years, and a Cornell study shows data center operators covered only 38% of related US grid costs.
todayIndustryWorley Wins Two-Year Field Construction Job at K+S Bethune Mine
Worley will run field construction for K+S's Compaction and Power Distribution project at the Bethune potash mine in Saskatchewan under a two-year contract covering structural, piping, mechanical, electrical and controls work.
todayRelated Guides
How Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Industry GuideWhat Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews
