A budgeting document used in oil and gas projects that outlines expected costs and seeks approval before work begins. Subcontractors often work under AFEs issued by operators.
AFE (Authorization for Expenditure)
Related Terms
Tubular Running
IndustryThe process of installing pipe, casing, or tubing strings into a wellbore during drilling or completion operations. Subcontractors providing tubular running services supply specialised crews and equipment such as power tongs and elevators. Accurate job scoping is critical, as rig time is costly and delays directly affect invoicing and contract performance.
Ballast
IndustryHeavy material (water, sand, or concrete) added to vessels, structures, or equipment to improve stability and balance. In field operations, managing ballast affects load planning, marine logistics, and offshore platform work. Subcontractors on marine or offshore scopes must account for ballast systems in scheduling and safety planning.
Tide Gate
IndustryA one-way valve or flap gate that allows water to drain freely but prevents backflow from rising tides or high water levels. Subcontractors working on coastal or waterfront sites must account for tide gate locations when planning drainage, excavation, or utility work. Ignoring these structures can cause flooding, schedule delays, and scope changes.
CPF (Central Processing Facility)
IndustryA fixed surface facility where oil, gas, and water from multiple wells are separated, treated, and prepared for transport or sale. For subcontractors, a CPF is often a long-term, high-activity work site requiring trades, maintenance, and operations crews. Scope can include initial construction, commissioning, turnarounds, and ongoing maintenance contracts.
Energy Storage
IndustrySystems that capture and hold power (batteries, flywheels, capacitors) for later use on remote or off-grid job sites. Subcontractors use them to reduce generator runtime and fuel costs. They are increasingly specified by clients in ESG-driven scopes.
LOI (Letter of Intent)
IndustryA written commitment from a client indicating they plan to award a subcontractor a contract. It allows work or mobilisation to begin before the formal contract is signed. LOIs are not always legally binding, so subcontractors should clarify payment obligations before proceeding.
Latest Industry News
Nevada Mining Association Names 2026 Safety Award Winners Across 27 Operations, 5 Contractors
NVMA's 2026 Mine Operator and Contractor Safety Awards recognized 27 mine operations and five contractors based on 2025 MSHA safety data, with winners honored in September at Lake Tahoe.
3 months agoIndustryDOE Clears First Molten Salt Reactor Safety Milestone in Texas
The Department of Energy has granted its first-ever Nuclear Safety Design Agreement for a molten salt reactor, developed by Abilene Christian University, marking a regulatory step toward future construction and testing.
3 months agoIndustryHyperscale Data Center Boom Tests Contractor Safety Systems at Scale
Engineering News-Record reports that hyperscale data center projects are straining general contractors' safety programs, pushing firms like JE Dunn to bring in outside consultants to standardize safety culture across dozens of subcontractors.
3 months agoIndustryPersonnel Changes Carry Hidden Safety Risk — MOC Processes Need to Cover People, Not Just Equipment
A column in Inspectioneering Journal argues that management of change processes are widely applied to equipment but inconsistently applied to personnel in critical roles, creating overlooked safety and compliance risk.
5 months agoRelated Guides
What Is an AFE in Oil and Gas and How Does It Affect Subcontractor Payments?
An AFE (Authorization for Expenditure) controls every dollar spent on an oilfield project. Learn how it affects your billing, change orders, and cash flow as a subcontractor.
Industry GuideHow Operator Mergers and Acquisitions Affect Your Subcontract Agreements
When operators merge, get acquired, or sell assets, subcontractor agreements are caught in the middle. Learn how M&A activity affects your MSA, payment terms, vendor status, and what to do before, during, and after a deal closes.
Industry GuideHow Rig Count Trends Affect Subcontractor Demand and What to Do About It
Rig counts are the earliest signal of where field service work is heading. Learn how to read drilling activity trends, anticipate demand shifts, and position your crew before the phone stops ringing.
Stay sharp on field operations
Industry news and insights, delivered to your inbox.
Subscribe to FieldNews